1626142-ei

Treasure Hunt for Coastal Gaslink

Over the past few months, several sections of the coastal gaslink pipeline have been vandalized. Financially, the consequences of each act were minor: a few holes in the pipeline here, some corroded welding seams there, damaged concrete here. Our goal was to contribute to the small delays in a project that was already well over budget. We drilled holes less than a penny wide in a section of pipe that had not yet been lowered into the trench. We covered the holes with fiberglass film, which temporarily prevents leaks in the pipes, but only lasts a few months. We know that welded sections of coated pipe are assessed before being lowered into the trench. After the trench is backfilled, they are tested under pressure. The holes were sealed in the hope that they would pass the first pressure test, but will have to be excavated and repaired before the pipeline is completed. This occurred during the last week of October on section 8 of the pipeline, between Kilometers 610 and 613. Between 585 and 588 kilometers of the pipeline, we found a section of pipe that had been dug out, so we damaged the coating at the joints by chipping and sanding it off in less visible places. This coating is needed to protect the pipe from corrosion and rust. We did this in early November. We liked this approach because the damage is not visible, but can still have a significant long-term structural impact if corrosion and rust show up, so it will need to be fixed. We drilled very small holes and filled them this time with an epoxy putty, somewhere between Kilometers 605 and 608 of the pipeline route (that’s in section 8.) We did this in the second week of November. We weren’t sure if the sealant would withstand the pressure test, but decided it was worth a try since this sealant is easier to source and use than the fiberglass coating. At the end of November, we drilled and filled holes in the pipe string before it would be lowered into section 6 of the pipeline between Kilometers 486 and 489. In early December, we chipped and busted the welds on a section of pipe that had not yet been lowered into the trench between Kilometers 606 and 609. We damaged the protective coating on a section of pipe by chipping and grinding, and chipped a welded seam on several sections of pipe before they were backfilled between Kilometer 377 and 380 of section 5 of the pipeline. This work was performed in early January. Near Kilometer 27 of North Hirsch forestry road we damaged welds and coating on a pipe section in the middle of January. We poured hydrochloric acid on the concrete pipes we knew were meant for the tunnel under Wedzin Kwa and used a concrete drill inside the pipe to weaken them even further. The concrete pipes are designed to protect the pipe itself from the pressure of the surrounding soil. Given the heightened security and surveillance of concrete pipe storage, we can’t say when this happened. In early December, we grinded and chipped the coating on the welded seams of the pipe sections between Kilometers 598 to 601. In mid February, we scraped and chipped large portions of the pipe coating of the string between Kilometers 626 and 629. Or is that in fact what happened? Only some of these activities have actually taken place. We waited to share this information all at once, complete with some additional false reports, so the only way to know where repairs are really needed is to excavate and re-examine all the above-mentioned pipes. Cracked concrete or rusted and patched pipes can lead to small leaks and large-scale spills, which is why every action, whether genuine or falsified, is being brought to the attention of the public long before the pipeline is operational. ...

February 27, 2023 · BC Counter-Info
bauer

Schrobenhausen, Germany: Arson on the Yard of Bauer (complicit in building Coastal GasLink)

On August 3, a few weeks after the involvement of the German company Bauer in the building process of the Coastal GasLink Pipeline through manufacturing equipment for the drilling process became known , local media report a nighttime fire on the company’s main office yard in Schrobenhausen, Germany. According to the media, three highly expensive vehicles were set on fire by unknown attackers. At least one of them is one of those phallus-shaped drilling machines, used to rape the earth during pipeline construction processes all over the world. While media photos show this machine completely torched, it is reported that the fires on two other machines could be extinguished, but caused nevertheless huge damages. For sure none of this machinery will be used for the construction of extractivist infrastructure sometime soon, be it at the drilling site near Wedzin Kwa or elsewhere in the world.

August 16, 2022 · Anonymous submission
lol-5af4c72

RBC: Divest from CGL

Monday April 11th, 2022 Tiohtià:ke/Montreal In the early afternoon, a small group of anarchists snuck into the RBC offices at Place Ville-Marie. Armed with flyers, stickers and spray paint cans, they left a message for the bank: DIVEST FROM CGL. Since the Fall of 2021, the Wet’suwet’en have been actively campaigning for RBC to stop funding the destruction of their land, but RBC continues to ignore them. ...

April 12, 2022 · Anonymous submission
renaudtinkerfev2022

RBC Quebec President Evening Home Visit! *Video*

Around dinner time on the night of February 23rd, two dozen anticolonial militants paid a surprise visit to RBC Quebec president Nadine Renaud-Tinker, at her 734 Upper Lansdowne avenue Westmount home. While Indigenous land defenders and settler accomplices resist wave after wave of colonial assaults to defend the Wet’suwet’en Yintah and the Wedzin Kwa river, investors like RBC comfortably profit off of the ongoing genocide of First Peoples and the destruction of unceded land for capitalist extractivist projects. Let’s remember that the Royal Bank of KKKanada leads a group of 27 banks providing the 6.8 billion dollars needed to build the Coastal GasLink Pipeline. It has, since 2016, contributed more than 200 billion dollars to the fossil fuel industry. ...

March 1, 2022 · Anonymous submission
FL1qMJMVQAAIweS

In Defence of the Attack on the CGL Drill Site

On February 17 the Coastal GasLink drill pad site by the banks of the Wedzin Kwa (morice river) was seriously damaged by an unknown group of courageous individuals. As anarchist individuals living in the North who are supportive of struggles in defence of the land and against ongoing colonization by canada and its corporate interests we declare our support for this action and encourage others to do so. ...

February 25, 2022 · Anonymous submission
FL1qMUYUcAcE154

Concerning the Attack on the Coastal GasLink Worksite on Marten Forest Service Road

What appears to be a highly effective act of sabotage carried out by Indigenous land defenders: cue the conspiracy theorists… And some aren’t even theorizing, they assert it as fact: it was the cops, it was CGL… Here’s a theory: the attack was carried out by Indigenous people who, in the cold dead of night, set out on a mission to sabotage the CGL pipeline. They carried out an audacious and complex attack that I would imagine started with getting the security guards away from vehicles and buildings. At some point after the security guards had fled, blockades and counter-vehicle devices were put in place on the only road leading to the site, delaying police response probably by hours. In that time the warriors carried out millions of dollars in sabotage. ...

February 19, 2022 · mtlcounter-info
Hamilton

Hamilton: RBC Attacked for Funding CGL Pipeline

There’s lots of smack to be said about Santa and, as anarchists, we aren’t big cheerleaders for the bearded guy; but we can appreciate that his sneaking game is on point. So a few of us celebrated this year by doing some sneaking of our own. Late into the night on Christmas 2021, a call was answered to attack the banks and funding sources of the CGL pipeline that is being forced on the Wet’suwet’en people. Banks – like RBC – are very easy targets as they have many branches across the cities we live in that are relatively unguarded at night. A Hamilton branch, on Upper James, was one such branch visited and redecorated. ...

December 29, 2021 · mtlcounter-info
FGSVj69VIAATQGq

December 20 International Week of Action: Defund Coastal GasLink

On the week of December 20, we are hosting an International Week of Action to Defund Coastal GasLink. Banks and private equity corporations are bankrolling Indigenous rights violations and destroying our shared climate. Their lack of accountability in financing colonial violence and land theft from Indigenous people is unacceptable. We are all in this together! We all have a responsibility to stand up to big financial institutions that invest and keep the fossil fuel industry going full force. ...

December 11, 2021 · mtlcounter-info
FENbdV0UcAM30-6

Morice Forest Service Road Destroyed as Gidimt'en Evict CGL from Wet'suwet'en Territory

Yesterday, we took our land back. With our Haudenosaunee allies, we enforced our ancient trespass laws and have permanently closed access to our territory. The Morice Forest Service Road has been destroyed and access to Coastal Gaslink is no longer possible. https://twitter.com/i/status/1460488812748886018 We are upholding our responsibility to defend our sacred headwaters and put an end to the destruction of the Yintah. We will never give up. Join the resistance and come to the yintah. ...

November 16, 2021 · mtlcounter-info
worker-filming-excavator-1024x576

Video: Wet’suwet’en Chief Dsta’hyl deactivates Coastal Gaslink Excavator; orders CGL out

First published at Real People’s Media LIHT’SAMISYU TERRITORY – On October 17th, Lihkt’samisyu Chiefs Dsta’hyl and Tsebesa took action as Coastal Gaslink workers continued to trespass on Wet’suwet’en territory in violation of Wet’suwet’en laws and Canada’s own constitution. The Chiefs instructed Coastal Gaslink to remove all equipment from Lihkts’amisyu territory immediately, indicating that otherwise it would be decommissioned and seized by the Likht’samisyu Clan in accordance with its laws. ...

October 20, 2021 · mtlcounter-info
Screenshot from 2021-09-26 13-45-34

Wet'suwet'en Territory: Gidimt'en Barricade CGL Access Road and Make Urgent Call for Support; RCMP Arrest One

On September 22nd, 2021 , after days of conflict between Gidimt’en/Cas Yikh Chiefs and members, Coastal GasLink and the RCMP, contractors completely cleared an archaeological site which has been destroyed with heavy machinery for the construction of a methane gas pipeline. On the morning of September 26th , the access road to Coastal GasLink’s drill site was destroyed. A series of blockades were put into place and the site was occupied. When the chiefs arrived onsite, they were threatened with arrest and denied access to their territory. One person was arrested during the occupation. Wet’suwet’en chiefs are trying to protect the sacred head waters of Wedzin Kwa. We cannot let them drill under this river. ...

September 26, 2021 · mtlcounter-info
wedzinkwa

BC: Direct Action Prevents Coastal GasLink from Drilling Under the Wedzin Kwa

Resistance is a living practice that spans across time and space. Interwoven webs connect peoples and communities - spreading fire from one space to the next. In its most subversive forms resistance will evade the capture of rationalization or quantification. Attempts to relay what is happening in any specific location will at best be incomplete stories, riddled by the storyteller’s bias. What follows is a story of recent moments of resistance to the construction of the Coastal GasLink Pipeline. This is just one story and makes no attempt to speak for the wide variety of individuals involved in this struggle. We share these stories in attempt to add fuel to the fire. We hope this contribution fans the flames and helps to one day engulf the contractors involved in the project’s construction. To learn more about the contractors involved see seedsofresistance.nublogs.org ...

December 7, 2020 · mtlcounter-info