Help Build a New Resistance Camp on Wet'suwet'en Territory!
Likhts’amisyu Spring Construction Camp: APRIL 28, 2019 – MAY 18, 2019 The Likhts’amisyu Clan, one of the five clans of the Wet’suwet’en Nation, will soon be asserting their sovereignty by creating a new, permanent land reclamation on their territory. In doing so, they are requesting support with their upcoming Spring Construction Camp, scheduled to begin on April 28th, 2019. For almost ten years, the Wet’suwet’en have been resisting an array of oil and gas pipelines with the purpose of transporting bitumen from the Alberta tar sands and fracked gas from Northeastern B.C. to the Northwest Coast for export. The focal point of these efforts have been the Unist’ot’en Camp, a long-standing territorial re-occupation which was built directly in the path of the proposed pipeline corridor. Years of resistance have caused multiple multi-billion-dollar projects to be delayed and/or cancelled, however, this winter, the Coastal GasLink pipeline corporation obtained an injunction, and in January, the RCMP raided the Gidim’ten Access Checkpoint, which had been established on the road leading to the Unist’ot’en Camp. Several days later, CGL and the RCMP breached the gate at the Unist’ot’en Camp. ...